McDonald’s Ballincollig

Solar Panel Installation

McDonald’s Restaurant

Project Details:

Branch: Old Fort Rd, Ballincollig, Co. Cork
Eircode: P31 FX65
System size: 15.12kWp (56 x 270 W)
Installation Time : 2 days

Design & Calculation

Solar Panel Installation

Clean Energy Solar designed the solar photovoltaic system on the south facing roof of the McDonalds building on the Old Fort Rd, Ballincollig.

The system is comprised of 56 solar panels – 270W PV modules, calculated based on energy consumption requirements. In addition, the solar panel installation includes the design, supply, installation commissioning and handover of the PV system, as well as a G10 grid protect relay and ESB witnessing the G10 test process. The installation did not include planning permission application costs.

Life expectancy25 years
Annual Electrical production13,900kWh
Annual CO2 savings5,560Kg (reducing carbon footprint)

System Details

Phonosolar Tier

Solar PV Module

PHS 270W 60 Cell Poly Silver

The PV modules used have a production warranty of 30 years and are tested to the highest international standards by TUV. These are manufactured in sn ISO9001:2008 And ISO14001:2004 certified facility.

Solar Inverter

Solis Single Phase 15kW 3 Phase gried tied DC TO AC in

Solis Industrial three phase inverters have a wide operating voltage range. Especially for Commercial Solar Projects. Dual MPPT tracking reduces losses caused by partial shading and allows a wider range of panel wiring from two different arrays. Solis Inverters exceed 95% efficiency under normal operating conditions and come with a 5-years warranty which can be extended to 10 years.

Mounting System

Renusol FS10, flat roof ballasted system with no penetrations

The FS10 mounting have been manufactured in Germany to the highest standards. The ballasted System allows for rapid deployment due to the absence of roof fixings and penetrations. The PV panels are held by placing standard concrete blocks in the ballast trays as specified by the site-specific wind load calculations.

Commercial solar panel installation

Grid Connection : G10 grid protection relay including commissioning in the presence of ESB personnel. As the G10 protection relay is only required if the PV system output is over 11 kW.

Why choose Clean Energy Solar for commercial solar projects?

Each installation is rigorously tested and documented during commissioning.
System components fully certified and manufactured to highest standard.
Professional, qualified, experienced installers.
18 years expertise in solar and energy efficiency sector.
Fully insured
Back to Commercial